Projects

New-WTW-Residuals-Handling-Facility-Construction

Water Indusrty

Client Project Description
Umgeni Water Wartburg Reservoir & Pump Station
Umgeni Water 1 Ml/Day Trustfeeds Wastewater Treatment
Tongaat Hullet Isibaya Sewer Pump Station
Rand Water Siyathemba Pump Station
Umgeni Water 10 Ml/Day Mpophomeni Wastewater Treatment Plant
uThungulu District Municipality Water Treatment Works Electrical & Mechanical Infrastructure Audit
Zululand District Municipality Pump Station for Bulk Water System
Agribusiness Development Agency Supply & Installation of Electrical Panels for Makhathini Irrigation Scheme

Professional Services

Client Project Description
Department of Public Works (KZN) KZN School Sanitation Programme – Electrical Consulting Engineers
Department of Public Works (KZN) Professional Engineering Services for Rydavale Clinic, KwaMashu, Durban
Department of Education (Ilembe District) Electrification of 7 x schools in the Ilembe Region
Ekurhuleni Metropolitan Municipality Germiston North 33/6.6 kV Substation Electrical Consulting & Infrastructure Audit
Ekurhuleni Metropolitan Municipality Barbara Road Substation Electrical Consulting & Infrastructure Audit
Department of Education (KZN) New JG Zuma Secondary School – KwaMashu – Electrical Consulting Engineers
pexels-edmond-dantes-8068875
719x488-8

Cathodic Protection

Client Project Description
Umgeni Water Cathodic Protection: Brunville Pipeline
Ethekwini Water & Sanitation Redclife Cathodic Protection System
Ethekwini Water & Sanitation Mahatma Ghandhi Road
Ethekwini Water & Sanitation Cato Ridge Cathodic Protection System
Rand Water Lushushwane Bulk Water System

Electrical Power

Client Project Description
ACTOM MV Switchgear Substation and MV Switchgear Maintenance
Ekurhuleni Metropolitan Municipality HV/MV Power Lines Upgrade and Switchgear
Mbhashe Local Municipality MV Overhead Lines & Electrification
Umgeni Water MV Transformer & MV Lines Project
Tastic Rice Corporation (Mobeni Factory) Energy Efficiency Audit and Process Optimization
WhatsApp Image 2025-02-19 at 18.22.03_e45d07d4
Scroll to Top